Skip to main content

CDBG Santa Rosa Road Accessibility Project

Page Title

Page Title

Low-angle view looking up a newly poured concrete pedestrian pathway with side rail, completed as part of the CDBG Santa Rosa Project.

35.466825750642, -120.64979498727

email: publicworks@atascadero.org

main phone: 805-470-3456

Quick Overview

Repairs and modifications of sidewalk, curb, ADA ramps, and railings on Santa Rosa Road between El Camino Real and Highway 101. Also includes pavement repair for 400' of Santa Rosa Road.

CONSTRUCTION UPDATES                        

• This project is complete!

CDBG Santa Rosa AFTER A  CDBG Santa Rosa AFTER B  CDBG Santa Rosa AFTER C

Project Overview

This project involves repairs and modifications of sidewalk, curb, ADA ramps, and railings on Santa Rosa Road between El Camino Real and Highway 101. Also includes pavement repair for 400' of Santa Rosa Road.

Project Timeline 

Engineering Design:  

  • Summer 2021 – Winter 2022 

Construction:  

  • Spring 2025 

Project Cost and Funding Sources:

  • Budget $386,808
  • Funded by:
    • Community Development Block Grant: 2020 Allocation ($114,566)
    • Community Development Block Grant: 2022 Allocation ($90,652)
    • Community Development Block Grant: 2023 Allocation ($120,155)
    • Community Development Block Grant: Reallocations ($61,435)

FAQs