Welcome to the Project Directory page where you can learn more about current and completed City projects.

Concept art for the ECR DIEP Project showing landscaping interspersed with angled center-of-road parking and pedestrian crossing areas.
Other - Public

El Camino Real Downtown Safety and Parking Enhancement Project

The El Camino Real Downtown Parking and Safety Enhancements Project (The ECR Project) improves safety, economic vitality, parking capacity and aesthetics of the El Camino Real downtown corridor

General Plan Update logo featuring a simple cutout illustration of City Hall and buildings, set against trees, rolling hills, and a bright sun on the horizon with a blue sky.
Other - Public

General Plan Update

The General Plan Update will shape how our city might change over the next 20 years. The General Plan is a comprehensive policy document that provides the general

Cropped view of a conceptual rendering of the East Mall Project by EHD Design Studio (2024), showing multi-story buildings around the Centennial Plaza entrance with ground-floor businesses and residential units on the upper floors.
Mixed-Use

Centennial Plaza Mixed Use Project

The Centennial Plaza Mixed Use Project includes two buildings separated by the existing City plaza and containing approximately 17,356 SF of commercial tenant space on the first and second floors

Concept art for a two-story residential planned development, featuring buildings with contemporary gray and white facades and wooden trim and accents.
Residential

Ten850 Planned Development

The proposed project consists of a total of 75 unit residential units that includes:

  • 48 independent living, senior apartments at a total of 3-stories in height;
  • 20 attached
View looking up a new concrete pathway at Atascadero Lake Park toward the renovated pier area, with part of the lake visible in the background.
Other - Public

Lake Park Pier and Pedestrian Pathway Project

Project Summary:
The City received grant funding to repair and improve pedestrian access on the Atascadero Lake Park Pier and adjacent sidewalk. Atascadero Lake Park is a

Large construction roller compacting fresh asphalt in a residential area, with orange cones and a construction worker performing additional work on another section of newly paved road in the background.
Roads - Measure F-14

Measure F-14 Road Projects

In 2014, Atascadero voters approved a ballot measure (F-14) which authorized the City to increase its sales tax rate by a ½ percent for a term of 12 years, together with a measure (E-14) advising

Paving crew in hi-vis vests working on a freshly paved road.
Roads

Santa Lucia Road West Pavement Rehabilitation Project

This project includes full pavement rehabilitation of approximately 1.8 miles of Santa Lucia Road (from Portola Road to Laurel Road) as well as minor edge improvements and drainage improvements

Plans for the Del Rio Marketplace project showing building locations, parking spaces, and landscaping.
Mixed-Use

Del Rio Marketplace

The Del Rio Marketplace project is anchored by a full service market, restaurants and a distillery. The surrounding buildings will be filled with a bustling job center including flexible work

3D-style rendering of a mixed-use development showing layout of buildings, parking areas, and landscaping.
Mixed-Use

Dove Creek Commercial

The Dove Creek Commercial Development serves as our community gateway from the south. This mixed-use project includes a community gathering space surrounded by family friendly marketplace with

Santa Lucia Bridge under construction, with workers preparing the wood deck for concrete.
Bridges

Santa Lucia Bridge Project

Project Summary:
Full bridge replacement and roadway approach improvements.
New bridge structures will be widened to meet current standards and safety regulations.

Drone view of the Lift Station 13 project site, showing two cut-out sections of roadway along with work trucks and equipment.
Wastewater

Lift Station #13 and Force Main Replacement Project

This project involves replacing Wastewater Lift Station #13 and constructing approximately 2 miles of force main pipe between El Camino Real and Orillas Way below Santa Cruz Road and Traffic Way

Close-up of a backhoe bucket positioned between orange construction fencing and sidewalk framing in progress for a concrete pour as part of the Downtown Paving project.
Roads

Downtown District Pavement Rehabilitation Project

As part of the City Council’s Key Priorities, the City of Atascadero approved the Downtown District Pavement Rehabilitation Project.  The project included upgraded

Concept art showing the front view of the Public Safety Facility, featuring brick accents and a cream-colored facade.
Facilities

Public Safety Facilities Project

Construction of new Fire Station #1 and Emergency Operations Center. Rehabilitation and upgrades to Fire Station #2 and Police Headquarters facilities. 

The Public Safety

Concept art for the Atascadero Pit Stop project showing a large angled covered structure (open on three sides) with “Pit Stop” printed on the edge, cars parked underneath, and a building in the background labeled “Deli.”
Commercial

Atascadero Pit Stop

The applicant proposes a fueling station with deli and market. The fueling station is designed with 12 gasoline pumps and 9 electric vehicle charging stations. The design is styled after Googie

Barrel Creek project map showing some lot boundaries and building locations.
Mixed-Use

Barrel Creek

This mixed-use development will showcase Atascadero as a "maker's space" with artisan goods, craft beer and entertainment. This project includes a 120 room hotel and outdoor space. The adjacent